Hydro Cooled Container Pre-sale Survey

BITMAIN welcomes you to participate in the hydro cooling container pre-sale survey! The survey has 16 questions which should take 15 minutes to complete.

1.Data center or mining operation location:

Country/Region:

Province:

City:

2. Are you familiar with BITMAIN's hydro container products?

Yes
No

3. Do you have experience operating and maintaining a hydro cooling data center?

Yes
No

4. Mining operation altitude:

<1000m
1000-2000m
>2000m

5. How many square meters of flat ground is available per megawatt:

<100m2/MW
100m2/MW~200m2/MW
>200m2/MW

6. Check whether the following conditions exist in the mining location: -Relative humidity is 100%, and the ambient temperature is higher than 32 ° C.- Ambient temperature is 40 ° C, and the humidity is greater than 60%. - Ambient temperature is 49 ° C, and the humidity is greater than 30%.

Yes
No

7. Check whether the ambient temperature in the mining operation site is higher than 29°C and if there is a water shortage during the year.

Yes
No

8. Is the mining operation site close to the river/lake/sea with good water quality and constant water flow?

Yes
No

9. Do local laws and regulations allow for the installation of electronic equipment by the river/lake/seawater?

Yes
No

10. Can the mining operation site provide a water consumption requirement of 1-2 tons/MW.h?

Yes
No

11. Does the local ambient temperature is lower than 29°C during the year:

Yes
No

12. Does the electricity price fluctuate in the mining operation location, and is the equipment is powered on and off frequently:

Yes
No

13. Can you accept if the mining equipment may require a startup period of one to six hours if the ambient temperature is lower than 0°C?

Yes
No

14. Is the power supplied to the mining operation site stable?

Yes
No

15. Does the site experience sandstorms or dusty conditions?

Yes
No

16. Does the site experience winter or snowy conditions? If so, is the thickness of the snow greater than 10mm?

Yes
No